Project Status

Research and Development Status

  • Bell siphon testing: completed
  • Venturi air siphon testing: incomplete
  • LED lighting testing: incomplete


Design and Construction Status

  • Formalize and finalize design: complete.
  • Acquire Materials:
    • Grow bed and sump/DWC tank lumber: done
    • Grow bed stand lumber done
    • Liner done
    • IBC  done
    • Plumbing components partially complete
    • Pump  done
    • Lighting components
    • Media
    • Radial flow clarifier components: postponed
    • Electrical components
    • Aeration components done
    • Testing kits/equipment done
    • DWC rafts done
    • Grow bed and sump/DWC polystyrene done
    • Paint done
  • Construction (in no particular order):
    • Grow bed partially complete
    • Sump/DWC tank partially complete
    • Stands done
    • Painting of all wood surfaces. raft tops
    • Supply plumbing
    • Return plumbing
    • Bell siphons
    • Venturi siphon(s)
    • Lighting build
    • Seedling nursery
    • DWC rafts partially complete
  • Installation (in no particular order)
    • Electrical install
    • Tanks, bed installs
    • Lighting install
    • Media wash and install
    • Aeration system install

    Operational Stage Overview
    • Testing
      • Plumbing tests
      • Siphon tests
      • Water clarity
      • Water quality (first test of all relevant water parameters)
      • Aeration system test
    • Cycling
      • Initial cycling to introduce nitrifying bacterial colonies
      • Transplant of bacterial colonies (if cycling before construction completion)
    • Plant Seedling Establishment
      • Start seedlings prior to introducing fish.
    • Fish Introduction
      • Acquire fish and feed
      • Follow guidelines for acclimatizing fish to system.
      • Follow guidelines for adjusting the pH of the transport water to that of the system.
    • Plant Introduction
      • First crop: leafy plants (salad greens, possibly beans and peas)
      • Monitor water parameters, supply essential nutrients as necessary
        • Chelated iron is likely
    • Maturation Period
      • System should mature after approximately 3 months of operation.
    • Operational Period
      • System is mature and fruiting plants can now be introduced.

    Current operational Status

    The system is not yet operational.